The gas composition in the pit of solid waste and hazardous waste pretreatment workshop and incineration workshop is complex, which contains a large amount of acid gas and alkaline gas
Treatment process: in the first step, the washing deodorization process is adopted, which uses the characteristics of neutralization reaction and dissolution in water between the pollutants in the waste gas and the alkaline absorption solution. In the second step, the activated carbon adsorption method is adopted to effectively adsorb the organic waste gas insoluble in water, so as to achieve the purpose of deodorization. Regularly discharge the washing deodorization equipment to the sewage treatment system for treatment.
Main features of the equipment: the washing tower adopts acid / alkali washing and water washing integrated tower + activated carbon adsorption for waste gas purification treatment, automatic control, up to standard discharge, small floor area, simple and convenient control operation, good treatment effect and low maintenance cost.